电脑桌面
添加清风知己到电脑桌面
安装后可以在桌面快捷访问

排水沟施工(英) .docx

排水沟施工(英) .docx_第1页
1/10
排水沟施工(英) .docx_第2页
2/10
排水沟施工(英) .docx_第3页
3/10
1 INFRASTRUCTURE WORK & UNDERGROUND CONDUIT, PIPE OF MECHANICAL, ELECTRICAL AND COMMUNICATION SYSTEM CONSTRUCTION CONTRACT(Contract No.: YDT-CONSTRUCTION-202111-035)Construction Me...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

排水沟施工(英) .docx

文档导读(AI 摘要)

分类:工作实务 | 全文约 1,757 字

文档全文

1 INFRASTRUCTURE WORK & UNDERGROUND CONDUIT, PIPE OF MECHANICAL, ELECTRICAL AND COMMUNICATION SYSTEM CONSTRUCTION CONTRACT(Contract No.: YDT-CONSTRUCTION-202111-035)Construction Method Statement ofDrainage Work Prepared by:Wang DalyuReviewed by:Liu WenxiangApproved by:Xiang Yuansheng2Date:April 28, 2022. Compilation Basis and ContentⅠ1. Technical Specification of Yedagun Taung City Development Project .2. Design drawings and related documents of Yedagun Taung City Development Project .3. Management Organization, human resources and equipment status of Sinohydro.4. Regulations and measures of construction management of Sinohydro.. Ⅱ Drainage channel work summary The drainage channel in this project mainly use reinforced concrete. And the concrete grade shall be confirmed according to the final determination of the designer and the Engineer. The channel width is with 7 types of 600mm, 800mm, 1000mm, 1200mm, 1600mm, 1800mm and 2000mm, and the channel depth shall be adjusted according to the design drawings.Section of drainage (take width of 600mm as an example).Construction PⅢrincipleThe construction shall be carried out strictly in accordance with the construction drawings, and closely cooperate with PPT and SJ in accordance with the specifications to ensure excellent project quality. The construction shall be completed within the construction period stipulated in the contract, and be organized strictly in accordance with the requirements of safety and civilization.3.Construction PreparationⅣ1. Prepare implementation rules for construction progress controlBreak down the control target of the overall progress and work our the time control nodes of the construction period. According to the control node, work out the work plan by...

来源:清风知己网

确认删除?
客服微信
  • 客服微信
回到顶部